HOME  |   CURRENT ISSUE   |   PAST ISSUES   |   RELATED PUBLICATIONS     IIIS   |   SEARCH     CONTACT US
 

ISSN: 1690-4524
Indexed in EBSCO

Editorial Advisory Board's Chair
William Lesso

Editor-in-Chief
Nagib C. Callaos


Sponsored by:
International Institute of Informatics and Systemics
Published by:
International Institute of Informatics and Cybernetics

 

Editorial Advisory Board

Journal's Reviewers
 

Description and Aims

Areas and Subareas

Information to Contributors


Adapting to Student Learning Styles: Using Cell Phone Technology in Undergraduate Science Instruction
Richard Pennington, Julia Paredes, Mai Yin Tsoi, Candace Timpte, Deborah Sauder, David Pursell
(pages: 1-5)

A Novel Control Algorithm for Integration of Active and Passive Vehicle Safety Systems in Frontal Collisions
Daniel Wallner, Arno Eichberger, Wolfgang Hirschberg
(pages: 6-11)

Investigation of a new low cost and low consumption single poly-silicon memory
Patrick Calenzo, Jean-René Raguet, Romain Laffont, Rachid Bouchakour, Philippe Boivin, Pascal Fornara, Stephan Niel
(pages: 12-16)

Linking Cognition to Cognitive Dissonance through Scientific Discrepant Events
Allen G. Rauch, Marjorie S. Schiering
(pages: 17-21)

Using Informatics to Create a New Triangular Array of e-Assessment Tools through an International Synergy between Education and Business
Gary R. Tucker, Tina Powers, Scott E. Hamm
(pages: 22-27)

Proposal of interference reduction routing for ad-hoc networks
Katsuhiro Naito, Kazuo Mori, Hideo Kobayashi
(pages: 28-33)

Scheduling real-time indivisible loads with special resource allocation requirements on cluster computing
Abeer Hamdy
(pages: 34-39)

Realistic Measurement of Student Attendance in LMS Using Biometrics
Elisardo González-Agulla, Jose L. Alba-Castro, Enrique Argones-Rúa, Luis Anido-Rifón
(pages: 40-42)

The Virtual Forest: Robotics And Simulation Technology As The Basis For New Approaches To The Biological And The Technical Production In The Forest
J. Rossmann, M. Schluse, Christian Schlette
(pages: 43-48)

New Evaluation Techniques of Hyperspectral Data
Veronika Kozma-Bognár, József Berke
(pages: 49-53)

Diversity Measures and Coarse-graining in Data Analysis with an Application Involving Plant Species on the Gal´apagos Islands
Radu Cornel Guiasu, Silviu Guiasu
(pages: 54-64)

Organizational Institutions and Their Responsible Behavioral-Cultural Gene Codes and A Measurement for Organizational Efficiency
Jason Jixuan
(pages: 65-70)

On the expanded information contents for the YUBITSUKIYI system and the Dementia situation taking account of Fuzzy concept of Markov’s information source
Masahiro Aruga, Kiyotaka Takagi, Shuichi Kato
(pages: 71-76)

Academic Globalization: Universality of Cross-Cultural And Cross-Disciplinary LMR Perspectives
Marta Szabo White
(pages: 77-82)


 

Abstracts

 


ABSTRACT


Software Support for the Classical, Contemporary and Future Project Management

Jakov Crnkovic, Peter Ross, Sanjay Desai


The volume and complexity of Project Management (PM) raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company’s information system (IS)? Where is the knowledge about company’s previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we) move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects) with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.



Full Text